Quality and reliability for top companies
Industrial Engineering

Frequently asked questions

How does costdata support industrial engineering and work planning?
costdata helps you evaluate manufacturing processes in terms of time and cost. Using cost estimation software, cycle time calculators, and machine and cost data, you can estimate processing times, compare manufacturing methods, and analyze the costs of individual operations.
Why should production times and costs be considered together?
A shorter processing time does not automatically result in lower manufacturing costs. For example, a faster machine may incur a higher hourly rate or additional tooling costs. Only by evaluating processing times, cost rates, and other expenses together can one determine which alternative is more cost-effective under the given conditions.
How can we estimate the processing times for new components?
Break down the manufacturing process into individual operations and determine the relevant technical parameters. Depending on the process, these may include, for example, geometry, material, scope of machining, and process parameters. Calculated times can serve as an initial basis for planning and should subsequently be validated against operational experience or measured values.
What is the difference between cycle time, processing time, and lead time?

Processing time refers to the duration of the actual processing. Cycle time refers to the duration of a defined, recurring sequence of operations and may include additional activities. Lead time encompasses the entire path of an order, including, for example, waiting, transport, and dwell times. To ensure a reliable comparison, it must be clear which time components are taken into account.

How can I compare different manufacturing processes in terms of cost-effectiveness?
Compare technically suitable processes based on uniform requirements for product, quality, and quantity. Take into account material usage, processing times, machine and labor costs, as well as tools, setup, and post-processing. This will reveal which process offers economic advantages for which production volume.
What role does the hourly machine rate play in selecting a machine?

The machine hourly rate quantifies the cost of using a machine per hour. Together with machining time, setup costs, and other expenses, it facilitates a cost-effective comparison of suitable machines. It is crucial to apply a consistent definition: for example, personnel costs or overhead costs must not be counted twice.

How do setup times and lot sizes affect unit costs?
Setup costs are typically incurred per setup operation and are allocated across the batch quantity produced. For small batches, the cost per unit is therefore often higher. Larger batches can reduce this cost per unit but may also result in additional inventory and tied-up capital. An economic analysis takes both effects into account.
How can a work plan be used for cost estimation?
A work plan describes the planned production steps and the required resources. When the work steps are assigned time estimates and appropriate cost rates, the result is a transparent production cost estimate. This makes it possible to identify cost-intensive work steps and compare alternative processes.
How can I compare manual and automated manufacturing processes?
Evaluate both options based on the same scope of work and realistic quantities. Take into account labor costs, equipment costs, capital expenditures, setup, maintenance, and quality. Also, analyze different capacity utilization scenarios to determine under what conditions automation is economically viable.
How are machine runtime and labor hours accounted for when multiple machines are operated?
Machine runtime and staff time should be considered separately. If a machine runs autonomously at times, the staff time does not have to correspond to its total runtime. The calculation should take into account actual operator tasks, potential overlaps, and organizational feasibility.
Does a calculated cycle time replace the operational time measurement?
A calculated cycle time provides a model-based time estimate for defined conditions. To determine reliable operational planned or target times, the actual work processes and relevant time components must also be analyzed. Calculations, empirical values, and operational time measurements can complement one another in this process.
How can the economic benefits of a process improvement be assessed?
Compare the current process with the planned one using the same quantity and cost assumptions. In addition to time and material savings, take into account implementation costs, investments, and potential quality impacts. Be sure to distinguish between actual reductions in expenses and freed-up capacity, the benefits of which depend on how it is utilized.

Evaluate Technical Options from an Economic Perspective

Calculate Production Times
Estimate processing and cycle times based on technical product and process parameters—as a basis for your planning and cost estimates.
Compare Machines and Processes
Evaluate suitable machines and manufacturing technologies based on cycle times, hourly rates, tooling costs, and setup time.
Optimize Legal Costs
Identify cost-intensive operations and analyze how changes in processes or batch sizes affect your unit costs.

The Right Basis for Your Calculation

costdata®calculation combines detailed cost models with tools for cycle time calculation and machine hourly rate calculation.
‍costdata® market data supplements your operational data with external reference values for materials, machines, wages, and location factors